Saint Paul, MN
My name is David Kuebler and I am a Professional Engineer for the City of Saint Paul. I have an undergraduate degree in Civil Engineering and a graduate degree in Infrastructure Systems Engineeriing. My current position with the City is as the City's Technical Lead for the Ford Site, aka Highland Bridge, which I've been doing officially since early 2020 and unofficially since early 2019.
I have been involved with Ford/Highland Bridge since 2013/2014 when Ford came to the City for the purpose of site demolition and soil remmediation. From 2019 through 2021 I was heavily involved in the plan development phase for the overall Highland Bridge project. From 2020 through present day I've been managing the construction process for the installation of all the public infrastructure (civil and parks), noting that construction will continue through this year and next. Since 2020 I've also been actively involved in the plan development phase for individual sites within the overall site.
I anticipate being involved with Highland Bridge through 2025 for construction and into 2026 for project closeout. Individual sites will continue to be developed long after I have retired.
The Ford Site: Exploring a New Urban Neighborhood
Sunday, April 14, 2024
9:00 AM – 12:00 PM CT